Laserfiche WebLink
CIRCES Cost Estimating Software <br />PMENT MOBILIZATION / DEMOBILIZATION <br />PROJECT IDENTIFICATION <br />Agency or organization name : DRMS <br />Task #: DMB State : Colorado Permit/job #:M-1983-139 <br />Date : 1213012010 County: Jefferson Abbreviation :none <br />User : DB2 Site : Leyden Pit Filename : M139-DMB <br />Permit or other job action : Si-1 From Feb 2010 Inspection <br />Task description : Demobilization of vehicles and equipment left on site <br /> <br />EQUIPMENT TRANSPORT RIG COST ............... ............ .........................i ::.......:::::::::::::::.................................. <br />Shift bass 1 per day <br /> Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br /> Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br /> Operating cost/hour : $44.38 $46.13 $50.07 <br /> Operator cost/hour : $27.66 $27.66 $27.66 <br /> Helper cost/hour:, $0.00 $25.39 $25.39 <br /> Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D8R Series ll - 8U (200 53.17 $46.56 $125.45 2 $344.02 $250.90 $300.00 <br />-CAT 962G (2003) 20.41 $24.47 $88.67 4 $452.56 $354.68 $600.00 <br />-CAT 135H 12.99 $19.88 $88.67 1 $108.55 $88.67 $150.00 <br />-Cat 322C L 2668 $33.62 $117.55 2 $302.34 $235.10 $300.00 <br />_ <br />-Cat 631G 51.23 $79.44 $125.45 1 $204.89 $125.45 $150.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $1,412.37 $1,054.80 $1,500.00 <br />sheet 1 of 2 <br />