Laserfiche WebLink
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Water Tanker, 5, 000 Gal. $99.74 1 $99.74 $99.74 <br />-Flatbed Truck, 42, 30K GVW $47.34 1 $47.34 $47.34 <br />-Light Duty Pickup, 44, 314 T. $50.59 1 $50.59 $50.59 <br />-Fuel Tanker, 6x4, 210 HP $81.57 1 $81.57 $81.57 <br />-tube Truck, 6x4, 210 HP $96.85 1 $96.85 $96.85 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $376.09 $376.09 <br />.:.... <br />.......: :.:.......:.._ _ I...................::::::. <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Golden <br />Transportation Cycle Time Non- Total one-way travel distance : 10.0 miles <br /> Roadable Roadable Average travel speed : 35.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.29 0.29 Total non-roadable mob/demob cost $10,736.38 <br />Return time (hours) = 0.29 0.29 'two round trips with haul rig <br />Loading time (hours) = 1.00 NA _ Total roadable mob/demob cost ** : $214.91 <br />Unloading time (hours) = 1.00 NA •? one round trip, no haul rig <br />Subtotals = 2.57 0.57 <br /> <br />:::::......... <br />JOB TIME AND COST. ........................... ................................ ....................... <br />.................................................................... <br />Total job time : <br />......... <br />5.14 hours <br /> Total job cost : $10,951