My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-01-04_REVISION - M1983139
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983139
>
2011-01-04_REVISION - M1983139
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:23 AM
Creation date
1/6/2011 2:09:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983139
IBM Index Class Name
REVISION
Doc Date
1/4/2011
Doc Name
Notice of FW Increase
From
DRMS
To
Pioneer Sand Company, Inc.
Type & Sequence
SI1
Email Name
DB2
MR1
AHH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date : 1213012010 County :Jefferson <br />User : DB2 Site : Leyden Pit <br />Permit or other job action : SI-1 from Feb 2010 inspection <br />Task description : Supervisor's truck <br />HOURLY EQUIPMENT COST <br /> <br />Truck make-up Description Data <br />Source <br />Make and model : Light Duty Pickup, 44, 314 T. (CRG) <br />Attachment no. 1 : NA NA <br />Attachment no. 2 : NA NA <br />Labor unit no. 1 : Fuel/tube Truck Driver (table) <br />Labor unit no. 2 : NA NA <br />Horsepower : 160 <br />Labor zone : 1 Weight : 2.25 US tons <br />Job shift basis : 1 Der dav <br />Job utilization <br />Cost Breakdown : Ownership cost/hour : $3.40 NA <br />Operating cost/hour : $7.66 100% <br />Operator(s) cost/hour : $38.70 NA <br />Total unit cost/hour : $49.76 <br />Total fleet cost/hour : $49.76 <br />JOB TIME Total job time : 187.00 Hours <br />JOB COST <br />Fleet size : 1 Truck(s) Unit cost : $49.76 /hour <br />Abbreviation : none <br />Filename : M139-SUP <br />Total job cost : $9,304
The URL can be used to link to this page
Your browser does not support the video tag.