Laserfiche WebLink
Project: <br /> <br />= • - GEQTECH . <br /> <br />........................................................... <br />. <br />.. <br />.. <br />.. <br />.... <br />Client / On Site Rep: <br /> <br />Bowie Resources / Basil Bear <br />Bowie Mine Gob Pile Stability . <br />. <br />.. <br />. <br />. <br />Civil, Structural & Geotechnical Engineers <br />222 South Park Ave. - Montrose, CO 81401 Contractor /Rep: <br />Bowie Resources / Gary Harding <br />Project No: <br />2005126-CMT Date: <br />12/9/2010 Ph.: (970) 249-6828 - FAX: (970) 249-0945 <br />CONSTRUCTION MATERIALS TESTING LABORATORY Technician: <br />G. Jones <br />DAILY CO MPACTION REPORT <br /> LOCATION TEST TYPE MAX DRY OPTIMUM DRY MOISTURE PERcENr NOT SOIL LAB SAMPLE <br />TEST <br />NUMBER GRADE ELI NUC SAND DENSITY <br />(pcf) MOISTURE <br />CONT. (%) DENSITY <br />(pcf) CONTENT <br />(%) coMPAC1GN W! "THIN <br />SPEC TYPE NUMBER <br />417 (PT#4565) N19350.33/E37642.34 6096.6 X 95.3 11.6 100.4 9.7 105.3 417&418 rc@1 777. <br />418 (PT#4566) N19332.73/E37947.87 6075.5 X 97.2 11.3 95.9 11.6 98.6 417&418 rc@16% <br />419 (PT#4567) N19475.75/E38149.82 6071.7 X 85.2 14,1 87.1 18.2 102.2 419 rc @ 6% <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />MOISTURE / DENSITY SPECIFICATIONS OBSERVATION / TESTING FIELD OBSERVATIONS <br />Specified Date: Compaction Equipment Used: <br />Compaction Cohesive Soils <br />Requirement: 90%+ Cohesionless Soils Full Time: Day S M T W Th <br />X F S <br />Sheepsfoot: I <br /> Part Time: Weather: Sun Clear Overcast Rain Snow CAT 815 <br />Specified X Smooth Drum Roller: <br />Moisture N/A Cohesive Soils <br />Requirement: Cohesionless Soils Number of Site Visits/Day: Temp: To 32 32-50 50-70 <br />X 70-85 85 Up <br />Vibratory: <br /> Testing Only: Wind: Still Mod High <br /> Requested By (Company Name): X Other (List Below): <br />ASTM Laboratory Testing <br />Procedure: D-698 Cohesive Soils <br />Cohesionless Soils <br />Bowie Resources <br />Humidity: <br />Dry <br />X <br />Mod <br />Humid <br />DENSITY J COMPACTION <br />ON THIS DATE FOR TESTING WAS NOT PERFORMED <br />THE FOLLOWING REASONS: Insufficient amount <br />lof material placed. Informed (Rep of Company) of Test Results: <br />Gary Harding <br />Bu <br />rn was not informed prior <br />Contractor Not Working Due To: The Contractor Is: o ou <br />t <br />contractor would not be working <br /> <br />Inclement Weather: <br /> <br />Equipment Malfunction: <br />Processing Frozen Material: Processing Wet Material: <br /> <br />Stripping andFor Grubbing: Moisture Conditioning Dry Mael: Field Copies Given To: <br /> <br />Contractor. <br />Client: on this date. <br /> <br />Q <br /> <br />Unknown: <br />Stockpiling Fill: Removing Unsuitable Math CM/GM: <br />Other: PAGE 1 OF 1 <br />05-126-CMT Bowie Mine No. 2 Gob Pile Stability CC-SJ 7.19.10.xis DCR12-9-10gj#417