Laserfiche WebLink
McClane Canyon Mining LLC <br />Water Sampling Report <br />Date: 10/18/2010 <br />Weather Conditions: Clear, 40 - 50 degrees F. <br /> Surface Water <br />Sample <br />Point Time Flow <br />cfs pH EC <br />umhos/cm Temp (C) <br />SW-1 12:15 PM 0.600 7.9 3300 1.0 <br />SW -2 11:45 AM Dry - - - <br />SW -3 10:36 AM Dry - - - <br />SW -4 12:30 PM Dry - - - <br />SW-5 11:50 AM Dry - - - <br />SW-6 10:40 AM Dry - - - <br />SW 7 10:40 AM Dry - - - <br />SW 8 11:00 AM 0.6 8.1 4400 1.2 <br /> <br /> Ground Water <br />Sample <br />Point <br />Time <br />(feet) SWL <br />PH <br />umhos/cm <br />Temp (C) <br />GW 1 11:30 AM 13.1 7.5 6900 10.7 <br />GW-3 10:45 AM 41.6 6.8 4400 11.2 <br />GW 6 10:30 AM Dry-18.8' <br />GW-9 11:51 AM 27.1 7.3 7700 11.0 <br />Location of Points/Wells <br />SW-1 East Salt Creek above McClane under haul road bridge <br />SW-2 McClane Creek at culvert below mine <br />SW -3 Munger Creek at haul road culvert below mine <br />SW -4 East Salt Creek -2 miles downstream of SW -8 <br />SW-5 McClane Creek above mine site at culvert inlet <br />SW -6 Munger Creek below mine before north split <br />SW -7 Munger Creek above Mine <br />SW -8 East Salt Creek between Munger and McClane Creeks at bridge <br />SW X McClane Creek at confluence with East Salt Creek <br />Fourth Quarter 2010 <br />Sampled by: Jim Stover <br />Meters Calibrated: Yes <br />GW 1 Alluvium of East Salt Creek about 3 Miles above McClane - TD 14.3' <br />GW 3 Alluvium of East Salt Creek just below Munger Canyon - TD 47.3' <br />GW-6 In Munger Canyon at the permitted waste rock disposal area - TD 18.8' <br />GW 9 Alluvium of East Salt Creek below proposed waste rock disposal area - TD 53.5 <br /> Feet <br />GW 1 Total Depth 14.3 <br />GW 3 Total Depth 47.3 <br />GW 6 Total Depth 18.8 Depth revised when pipe was damaged <br /> during gob pile construction. <br />GW 9 Total Depth 53.5 <br />4?Qs <br />c ;''F * % <br />??sau?