Laserfiche WebLink
• <br />• <br />J <br />Q <br />U <br />x <br />m <br />s <br />W U <br />F <br />O <br />w <br />t� <br />:,E b Huddleston -Berry Engineering& Testing, LLC BORING NUMBER BH -13 <br />640 %Vhite Avenue, Unit B <br />+' Grand Junction, CO 81501 PAGE 1 OF 1 <br />970- 255 -8005 <br />970 -255 -6818 <br />CLIENT River City Consultants PROJECT NAME New Elk Mine <br />PROJECT NUMBER 00456 -0004 PROJECT LOCATION Trinidad, CO <br />DATE STARTED 8/5110 COMPLETED 8/5110 GROUND ELEVATION HOLE SIZE 4 -inch <br />DRILLING CONTRACTOR S. McKracken GROUND WATER LEVELS: <br />DRILLING METHOD Simco 2000 Track Rlg AT TIME OF DRILLING dry <br />LOGGED BY MAB CHECKED BY MAB AT END OF DRILLING dry <br />NOTES AFTER DRILLING - -- <br />u <br />W o <br />ATTERBERG <br />LIMITS <br />!- <br />W <br />°� O <br />MATERIAL DESCRIPTION <br />rY <br />>- <br />j a <br />N <br />O Q <br />a <br />z <br />o: <br />Z <br />O <br />o f <br />U <br />c� <br />z <br />m0� <br />c�z <br />Y� <br />2u <br />ziz <br />�z <br />w <br />W <br />a <br />o <br />aJ <br />K <br />0 <br />0- <br />W <br />Gravelly SAND (sw), brown, dry, medium dense <br />"Auger Re fusal at 1.0 ft" <br />1 <br />Bottom of hole at 1.0 feet. <br />s <br />i <br />c <br />i <br />i <br />i <br />i <br />