Laserfiche WebLink
• (22) Colowyo Alluvial Valley Floor Analysis Report, bound report prepared <br />for Colowyo Coal Company by Dames & Moore, December 5, 1995 <br />(contains specific references to Collom Project Area) <br />(23) Northwest Colorado Coal Environmental Impact Statement, <br />prepared by the U.S. Department of the Interior and the BLM, Five <br />volumes including Volume III of W.R.Grace and Company Mine and <br />Reclamation Plan (General hydrology of region, etc.) <br />(24) The Yampa River Basin, Colorado & Wyoming — A Preview to <br />Expanded Coal- Resource Development and It's Impacts on <br />Regional Water Resources, prepared by the USGS, Water Resources <br />Investigations 78 -126, September 1979 (General Region Information) <br />(25) Northwest EIS Supplemental Report, prepared by the US Dept of the <br />Interior and the BLM,(additional regional hydrology information) <br />(26) Resource and Potential Reclamation Evaluation Taylor Creek Study <br />Site, Axial Basin Coal Field, EMIRA Report No. 3 -1975, bound report <br />and executive summary report prepared by the BLM (Area east of Collom, <br />regional information) <br />(27) Guidelines for the Collection of Baseline Water Quality and <br />Overburden Geochemistry Data, prepared by the Colorado Mined Land <br />Reclamation Division, Coal Section (copy of guideline issued September <br />• 16, 1982) <br />(28) 2003 Annual Reclamation Report and Annual Hydrological Report, <br />prepared by Colowyo Coal Company for the CDMG, Permit C -81 -019, May <br />6, 2004 (Operations data east of Collom Project Area) <br />(29) 2003 Water Analytical Data, bound report tabulated by Colowyo Coal <br />Company prepared by Colowyo Coal Company, (Operations data east of <br />Collom Project Area) <br />(30) Geological Map Suite (189 separate maps), mineable seam thickness, <br />overburden thickness, interburden thickness, coal quality parameters, <br />incremental and cumulative stripping ratio, seam floor slope and elevation <br />contours (covers Collom Project Area) <br />(31) Collom Preliminary Mine Plan and Cross Sections Map, March 4, <br />2004, prepared by Colowyo Coal Company, (shows Phase 1 and 2 pits, <br />box cut outline, drill holes, etc. for Collom Project Area) <br />(32) Colowyo Mine Well Locations Map, prepared by Colowyo Coal <br />Company, (shows location of Colowyo Mine's well locations) <br />(33) Collom Project Regional Map, prepared by Colowyo Coal Company and <br />geological consultants, June 2004, (shows regional location of Collom <br />Project area, roads, mining operations, drill holes, Exploration License <br />• outline, surface ownership, topography, roads, 1" =2,000 feet, etc.) <br />