|
• Appendix E
<br />Outline of Historic Geological and
<br />Environmental Documents of the Collom Area
<br />(1) Final Ground Water Baseline Report, Danforth Hills Property, bound
<br />report prepared for Consolidated Coal Company by Camp Dresser &
<br />McKee, Inc., November 5, 1985 (Southeast of Collom Project Area)
<br />(2) Final Surface Water Baseline Report, Danforth Hills Property,
<br />bound report prepared for Consolidated Coal Company by Camp Dresser &
<br />McKee, Inc., October 8, 1985 (Southeast of Collom Project Area)
<br />(3) Geotechnical Evaluation Three Alternative Surface Mine Sites
<br />Colowyo Mine Moffat and Rio Blanco Counties Colorado, bound
<br />report prepared for Kennecott Energy Corporation by CTL Thompson, Inc.,
<br />J une 25, 2003 (Portions are specific to Collom Project Area)
<br />(4) Geologic Correlation, Interpretation and Delineation (GEOCID) of
<br />the Colowyo Reserve Areas Moffat and Rio Blanco Counties,
<br />Colorado, bound report prepared for Colowyo Coal Company, L.P. by
<br />Glenn E. Miller, Inc., June 1998, Volumes 1 (Text), Volume 2 -5 (Maps)
<br />(Portions are specific to Collom Project Area)
<br />• (5) Geologic Depositional Model Report, bound report prepared for
<br />Colowyo Coal Company, L.P. by Steven W. Korte, Consulting Geologist,
<br />February 2003 (Portions are specific to Collom Area)
<br />(6) Analysis of Joint and Cleat Studies, Colowyo Mine, Meeker,
<br />Colorado, bound report prepared for Colowyo Coal Company by Brant A.
<br />Dennis, Consulting Geologist, July 20, 2002 (area immediately east of
<br />Collom Project Area)
<br />(7) Rock Mechanics Testing and Coal Mine Roof Rock Assessments,
<br />bound report prepared for Kennecott Colorado Coal Company by Agapito
<br />Associates, Inc., January 2003, (East of Collom Project Area, longwall
<br />geotechnical assessment)
<br />(8) Application For Federal Exploration License, document prepared by
<br />Colowyo Coal Company for the Bureau of Land Management, April 12,
<br />2004 (Exploration license for Collom Area)
<br />(9) Federal Exploration Plan Approval with Stipulations, letter prepared
<br />by the Bureau of Land Management for Colowyo Coal Company, May 24,
<br />2004 (Approved Exploration Plan for Collom Area)
<br />(10) Preliminary Hydrological Plan For Surface and Ground Water
<br />Monitoring, Proposed Surface and Underground Operations,
<br />Kennecott Energy, Colowyo Coal Company, Meeker, Colorado,
<br />memo prepared and modified for Colowyo Coal Company by Brant A.
<br />• Dennis, Consulting Geologist, June, 2004 (Preliminary hydrological plan
<br />for Collom)
<br />
|