Laserfiche WebLink
• Appendix E <br />Outline of Historic Geological and <br />Environmental Documents of the Collom Area <br />(1) Final Ground Water Baseline Report, Danforth Hills Property, bound <br />report prepared for Consolidated Coal Company by Camp Dresser & <br />McKee, Inc., November 5, 1985 (Southeast of Collom Project Area) <br />(2) Final Surface Water Baseline Report, Danforth Hills Property, <br />bound report prepared for Consolidated Coal Company by Camp Dresser & <br />McKee, Inc., October 8, 1985 (Southeast of Collom Project Area) <br />(3) Geotechnical Evaluation Three Alternative Surface Mine Sites <br />Colowyo Mine Moffat and Rio Blanco Counties Colorado, bound <br />report prepared for Kennecott Energy Corporation by CTL Thompson, Inc., <br />J une 25, 2003 (Portions are specific to Collom Project Area) <br />(4) Geologic Correlation, Interpretation and Delineation (GEOCID) of <br />the Colowyo Reserve Areas Moffat and Rio Blanco Counties, <br />Colorado, bound report prepared for Colowyo Coal Company, L.P. by <br />Glenn E. Miller, Inc., June 1998, Volumes 1 (Text), Volume 2 -5 (Maps) <br />(Portions are specific to Collom Project Area) <br />• (5) Geologic Depositional Model Report, bound report prepared for <br />Colowyo Coal Company, L.P. by Steven W. Korte, Consulting Geologist, <br />February 2003 (Portions are specific to Collom Area) <br />(6) Analysis of Joint and Cleat Studies, Colowyo Mine, Meeker, <br />Colorado, bound report prepared for Colowyo Coal Company by Brant A. <br />Dennis, Consulting Geologist, July 20, 2002 (area immediately east of <br />Collom Project Area) <br />(7) Rock Mechanics Testing and Coal Mine Roof Rock Assessments, <br />bound report prepared for Kennecott Colorado Coal Company by Agapito <br />Associates, Inc., January 2003, (East of Collom Project Area, longwall <br />geotechnical assessment) <br />(8) Application For Federal Exploration License, document prepared by <br />Colowyo Coal Company for the Bureau of Land Management, April 12, <br />2004 (Exploration license for Collom Area) <br />(9) Federal Exploration Plan Approval with Stipulations, letter prepared <br />by the Bureau of Land Management for Colowyo Coal Company, May 24, <br />2004 (Approved Exploration Plan for Collom Area) <br />(10) Preliminary Hydrological Plan For Surface and Ground Water <br />Monitoring, Proposed Surface and Underground Operations, <br />Kennecott Energy, Colowyo Coal Company, Meeker, Colorado, <br />memo prepared and modified for Colowyo Coal Company by Brant A. <br />• Dennis, Consulting Geologist, June, 2004 (Preliminary hydrological plan <br />for Collom) <br />