Laserfiche WebLink
Collom Area Geology Pre - Feasibility Report <br />• <br />is <br />0 <br />Mining Factors of <br />The specific mining factors and assumptions involved with <br />Assumptions <br />pit designs will be available in the 2005 -2009 Operating <br />Plan and 2005 Life -of -Mine Plan the Colowyo <br />Administration building. <br />Cost and Revenue factors <br />The specific cost and revenue factors will be available in <br />2005 -2009 Operating Plan and 2005 Life -of -plan mine <br />tans in the Colowyo Administration Building. <br />Market Assessment <br />Colowyo has numerous coal contracts of varying terms. <br />Colowyo currently has approximately 4.5 million tons of <br />coal under contract for 2005. Additional and detailed <br />marketing specifications can be obtained from KEC <br />marketing personnel. <br />Page 4 of 4 <br />