My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-12-17_REVISION - C1981019 (128)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2010-12-17_REVISION - C1981019 (128)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:28:03 PM
Creation date
1/4/2011 10:56:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
12/17/2010
Doc Name
Exhibit 7 Item 23 Erosion and Sedimentation Part 2
Type & Sequence
PR3
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />EXHIBIT 7, ITEM 23, PART B <br />Little Collom (LCX -IN) Sump Design <br />The location of the Little Collom Sump is presented on Exh. 7 -23, Figure Al. Formerly, this <br />structure was referred to as the LCX -IN (Little Collom X Incised) structure, and the modeling <br />presented in Part A of this section still references that name. <br />This pond will be built before any other mining or construction activities occur. Construction of <br />this pond needs to be concurrent with the construction of the Little Collom Pond located <br />downstream. <br />This structure will be constructed at or near the base of the X4 coal seam. This large sump will be <br />entirely below grade with minimal embankment. Thus it will be the lowest point in the area; the <br />impoundment will be evacuated by pumping. SEDCAD modeling for the initial mining case is provided <br />in Exhibit 7, Part A. <br />This pond will provide the majority of sediment control for the Collom mine plan. It is located near the <br />downstream toe of the Temporary Spoil stockpile. <br />The design drawing for the pond is presented in Exhibit 7, Item 26, Figure 2. Total capacity of the <br />impoundment is about 103 acre -feet. Total depth is about 32 feet. <br />• This pond will not provide ultimate sediment control; that function will be provided by the Little <br />Collom Pond located downstream. <br />• <br />This structure will remain in place throughout the life of Collom mine plan and will only be removed <br />concurrent with bond release of the upstream drainage area. <br />The following tables summarize the design details and SEDCAD modeling results as presented in Part A <br />of this section.. <br />Exh. 7 -23B -1 Revision Date: 12/15/10 <br />Revision No.: PR -03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.