Laserfiche WebLink
DRAFT <br />C� <br />w <br />C� e7'LNk1: NW <br />TABLES <br />2572 -R1 <br />Water Management Consultants <br />Colowyo Coal Company, L.P. <br />Page <br />1 <br />INTRODUCTION <br />1 <br />1.1 <br />General setting <br />1 <br />1.2 <br />Project description <br />3 <br />1.3 <br />Objectives <br />4 <br />2 <br />SAMPLING PROGRAM REQUIREMENTS <br />5 <br />2.1 <br />Rationale for sampling <br />5 <br />2.2 <br />Groundwater and surface water sampling locations and <br />analytical suites 6 <br />2.3 <br />Geochemistry <br />12 <br />3 <br />FIELD INVESTIGATION PROCEDURES <br />14 <br />3.1 <br />Introduction <br />14 <br />3.2 <br />Drilling /geologic sampling /borehole logging <br />14 <br />3.3 <br />Piezometer construction <br />14 <br />3.4 <br />Well construction and development <br />14 <br />3.5 <br />Hydraulic testing <br />15 <br />4 <br />SAMPLING PROCEDURES <br />16 <br />4.1 <br />Introduction <br />16 <br />4.2 <br />Groundwater sampling procedures <br />16 <br />4.3 <br />PLS and seepage water measurement and sample collection procedures20 <br />4.4 <br />Soil sampling procedures <br />22 <br />5 <br />QUALITY ASSURANCE PROJECT PLAN <br />23 <br />5.1 <br />Objectives <br />23 <br />5.2 <br />Field quality assurance program <br />23 <br />5.3 <br />Laboratory <br />25 <br />5.4 <br />Data verification <br />28 <br />TABLES <br />2572 -R1 <br />Water Management Consultants <br />Colowyo Coal Company, L.P. <br />