Laserfiche WebLink
slow the delivery of channelized storm runoff. Areas that will need future mitigation are two <br />moderate gullies running northwest to southeast in area S-4 and a gully running northeast to <br />southwest in the Fill 7a area. Please ensure that these two areas are addressed in the next <br />field season. <br />Photographs <br />4 <br />Bales and check dams above Pond 6 - main ditch <br />Regrading and straw bales in side ditch above Pond 6