My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-12-30_REVISION - M1980047
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980047
>
2010-12-30_REVISION - M1980047
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2020 2:02:10 PM
Creation date
1/3/2011 11:16:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980047
IBM Index Class Name
REVISION
Doc Date
12/30/2010
Doc Name
Submittal of Technical Revision TR-14
From
Exxon Mobil
To
DRMS
Type & Sequence
TR14
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment B <br />1) Survey Plats for Water Monitoring wells: <br />• WW-CC-ID1 and WW-CC-SDI. <br />2) Wellbore Sketch for Water Monitoring wells: <br />• WW-CC-ID1 and WW-CC-SD1. <br />3) Reclamation cost estimate for the two Water Monitoring wells: <br />With 4 inch ID casing and depths of 110 feet for WW-CC-ID I and <br />WW-CC-SDI, the total volume to fill with cement is 20 cubic feet. <br />Each 110 foot well has a capacity of 10 cu ft. <br />• Typically a 94-1b sack of cement (Type I/II) fills a volume of 1.28 <br />cubic feet (six gallons of water mixed with one sack of cement). <br />So, 16 sacks of cement are required to cement both wellbores to <br />surface. <br />• A typical pallet of cement contains 40 sacks. At $10/sack this will <br />be $400. <br />• Labor cost for one day at 1 Ohrs/day (two people), ($100/hr) will be <br />$2000. <br />• Rental of a cement mixer/pump (two days minimum @ $100/day) <br />will be $200. <br />• Rental of an air compressor (two days minimum @ $100/day) will <br />be $200. <br />• Rental of a Pickup Truck (one day @ $100/day) will be $100. <br />• Hotel and food for the crew will be $300. <br />Total reclamation cost for two wells is estimated to be $3200. With <br />50% contingency, the total cost is $4800. <br />M-1980-047 Technical Revision 14 Submittal Page 9
The URL can be used to link to this page
Your browser does not support the video tag.