Laserfiche WebLink
-4- <br />12. Primar future (Post-mining) land use check one : <br />ILI Cropland(CR) Pastureland(PL) F? General Agriculture(GA) <br />R Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br />Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br />Developed Water Resources(WR) Solid Waste Disposal(WD) <br />13. Primarv present land use (check one): <br />Cropland(CR) Pastureland(PL) General Agriculture(GA) <br />II Rangeland(RL) Forestry(FR) WildlifeHabitat(WL) <br />Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br />Developed Water Resources(WR) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />Front end loaders, dozers, backhoes, dump trucks and conveyor belts. <br />15. On Site Processing: _1 Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />Front end loaders, dozers, backhoes, dump trucks and conveyor belts. <br />List any designated chemicals or acid-producing materials to be used or stored within permit area: <br />None <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />Rio Blanco County Road and Bridge is amending the present permit to include a parcel of land <br />of that is owned by the Bureau of Land Management directly North of the existing gravel pit, and <br />to also *nelude the aeeess read into the gFavel pet. <br />Page 6 of 60