Laserfiche WebLink
Addendum to the Collom Area Geology Pre - Feasibility Report <br />• The majority of the resources in all three areas are in the Measured and <br />• Indicated categories. The proportions change according to the variable. <br />• Drilling density may not be adequate for coal quality data in areas to be <br />mined in years 1 and 2 in the South Taylor box cut. CCC believes that <br />drilling may be required here for other reasons. <br />• CCC has a good understanding of the geotechnics of the new S Taylor and <br />CoHom pits and Lower Wilson underground mine. Geotechnical data were <br />reviewed by TEG in January 2006 <br />U <br />U <br />September 2006 Page 8 of 25 <br />