My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-12-17_REVISION - C1981019 (114)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2010-12-17_REVISION - C1981019 (114)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:28:02 PM
Creation date
12/30/2010 10:51:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
12/17/2010
Doc Name
Exhibit 5 Item 2 Historic Properties Treatment Plan for Four Sites Within Project
Type & Sequence
PR3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Historic Properties Treatment Plan, Collom Mine, Colorado 3 <br />• <br />• <br />7 <br />67 <br />Two phases of work are proposed. Phase I excavation will consist of auger tests, 1 x 1 -m test <br />units, and backhoe trenches to assess the potential for significant buried archaeological deposits <br />at the sites. The primary goal of the Phase I excavations is to assess different areas of the sites <br />to determine the placement of the Phase II excavations. These phases will mitigate adverse <br />effects to the eligible properties. <br />Both phases of this project are guided by a research design presented below in Section 2.0. The <br />site descriptions and NRHP recommendations are included in Section 3.0. Section 4.0 consists <br />of the proposed scope of work for Phases I and II at each site. Finally, Section 5.0 presents field <br />methodology for Phases I and II, as well as laboratory methods for both phases. <br />47599 <br />TRC Mariah Associates Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.