My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-12-17_REVISION - C1981019 (153)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2010-12-17_REVISION - C1981019 (153)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:28:04 PM
Creation date
12/30/2010 10:50:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
12/17/2010
Doc Name
Exhibit 7 Item 21 Collom Project Pre-Feasibility Hdyrology Report
Type & Sequence
PR3
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contents <br />6 SLOPE DEPRESSURIZATION MODEL 77 <br />6.1 General 77 <br />6.2 Basis for model 77 <br />6.3 Highwall model 79 <br />6.4 Advancing wall model 81 <br />6.5 Sidewall model 82 <br />6.6 Summary and conclusions 84 <br />7 <br />MINE WATER MANAGEMENT <br />85 <br />7.1 Requirements for dewatering <br />85 <br />7.2 Conceptual dewatering design for Option 1 (north to south mine plan) <br />86 <br />7.3 Conceptual dewatering design for Option 2 (south to north mine plan) <br />93 <br />8 <br />CONSIDERATIONS FOR FEASIBILITY AND PERMITTING <br />99 <br />8.1 Feasibility considerations <br />99 <br />8.2 Permitting considerations <br />101 <br />9 <br />REFERENCES <br />103 <br />TABLES <br />3.1 <br />Precipitation period of record and missing data <br />14 <br />3.2 <br />Precipitation data summary <br />15 <br />3.3 <br />Storm precipitation amounts for the Collom Pit area <br />16 <br />4.1 <br />Stream inventory summary <br />20 <br />4.2 <br />Surface water quality summary <br />25 <br />4.3 <br />Spring and seep inventory <br />29 <br />4.4 <br />Spring water quality summary <br />34 <br />5.1 <br />Summary of pre- existing wells <br />46 <br />5.2 <br />Bedrock baseline monitoring well details <br />49 <br />5.3 <br />Valley fill monitoring well details <br />49 <br />5.4 <br />Bedrock standpipe piezometer details <br />51 <br />5.5 <br />Vibrating wire piezometer details <br />52 <br />5.6 <br />Hydraulic parameters <br />55 <br />5.7 <br />Summary of measured hydraulic conductivities <br />61 <br />5.8 <br />Summary of bedrock groundwater quality <br />65 <br />5.9 <br />Summary of valley fill groundwater quality <br />66 <br />6.1 <br />Model parameters <br />78 <br />7.1 <br />Schedule for Phase 1 mine <br />87 <br />7.2 <br />Schedule for Phase 2 mine <br />88 <br />7.3 <br />Dewatering well schedule for Phase 1 of Option 1 mine plan <br />91 <br />7.4 <br />Summary of estimated dewatering rate <br />92 <br />7.5 <br />Dewatering well schedule for Option 2 mine plan <br />95 <br />7.6 <br />Summary of estimated dewatering rate <br />97 <br />2572 -R2 <br />Colowyo Coal Company <br />Water Management Consultants <br />
The URL can be used to link to this page
Your browser does not support the video tag.