Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources L <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />COLORADO <br />D I V I S I O N OF <br />RECLAMATION <br />MINING <br />SAFETY <br /> <br />D <br />b <br />29 <br />2010 Bill Ritter, Jr. <br />ecem <br />er <br />, Governor <br /> Mike King <br />Kenneth Morrison Executive Director <br />,Lincoln County L <br />E <br />Pin <br />d <br />tt <br /> <br />rd ore <br />. <br />a <br />a <br />e <br />Ave. <br />1033 Director <br />P.O. Box 39 <br />Hugo, CO 80821 <br /> <br />RE: Jamaco Pit; DRMS File No. M-2010-082; Receipt of 110 Construction Materials <br />Reclamation Permit Application Package <br />Dear Mr. Morrison, <br />On December 21, 2010 the Division of Reclamation, Mining and Safety (Division) received your <br />110 Construction Materials Reclamation Permit Application package for the Jamaco Pit, File No. <br />M-2010-082. Jfrr'eliminary review of the information received determined that the following <br />items must be received efore the Division can consider your application as being submitted and <br />technical review can begin: <br />Application Form <br />1. The General Description was not completed on page 3 of the Application Form. Please <br />submit a revised copy of page 3 with the General Description provided. <br />2. The Certification page, page 7 of the Application Form, was not filled out completely. Please <br />submit a revised copy of the Certification page with the State and County information listed <br />and the line before the notary signature completed. In addition, all signatures must be in bl - <br />ink. Please ensure the notary signature is in blue ink on the revssed Certificat' e. A <br />copy of the Certification page, with the required revisions highlighted, has been enclosed for <br />your review. <br />Your application will not be considered submitted until the information listed above is received <br />and found sufficient to begin our review. A decision date will be established 30 days from the <br />date of receipt of all of the requested information. Additionally, if you have already published <br />notice you will need to republish notice, after the Division considers the application submitted. <br />This notice must be published once, starting within ten (10) days of the date your application is <br />considered submitted. We will notify you when you should initiate republication of your notice. <br />The final date for receiving comments is the 10th day after the publication or the next regular <br />business day. <br />Office of ® Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines