Laserfiche WebLink
RULE 4 PERFORMANCE STANDARDS <br />a <br />0 Pre - Blasting Survey <br />In accordance with Rule 4.08.2, written notification will be provided to all residents and/or owner of <br />dwellings or other structures that are located within one -half mile of the Collom permit expansion area. <br />Copies of the letters will be included as an exhibit in the permit documentation under Exhibit 14, Item 8. <br />Pre - Blasting Surveys specific to the Collom permit expansion area will be conducted prior to <br />commencement of mine operations at the Collom permit expansion area. Due to the proximity of the <br />permit expansion area to the existing Colowyo permit area, many of these residents and owners may <br />remain unchanged. As pre - blasing surveys are completed, a list of individual owners, subject to blast <br />disturbance, will continue to develop. Preliminarily identified residents that may experience blasting <br />related may found in Exhibit 14, Item 8. <br />Colorado Oil and Gas Registered Facility Locations <br />There are three locations within the proposed permit boundary extension for the Collom Mining <br />Area (Map 11B — Well and Drillhole Locations) that are identified in the Colorado Oil and Gas <br />Conservation Commission database. They are described as follows: <br />1) ID# 05- 081 -07203 — Plugged and abandoned oil exploration well. Owned by Infinity Oil & <br />Gas of Wyoming, completed in December, 2004. Plugged and abandoned July, 2005. <br />2) ID# 05- 081 -06328 — Plugged and abandoned oil expoloration well. Owned by Tiger Oil <br />Company, completed February, 1978. Plugged and abandoned February, 1978. <br />3) ID# 05- 081 -06339 — Planned oil exploration well location permitted but well was not <br />constructed and the drilling permit was allowed to expire in May, 1978. Owned by Tiger Oil <br />Company. <br />4.09 DISPOSAL OF EXCESS SPOIL <br />Spoil removed from the Collom Lite and Little Collom X pits will be stockpiled in a temporary fill area as <br />shown on Maps 23B and 29C (Temporary Spoil Pile Design). Map 29B shows the timing of spoil <br />grading completion and the initiation of reclamation activities. Volume 20, Exhibit 23, Item 1 provides <br />the geotechnical report for the temporary spoil pile. Colowyo expects a swell of excavated materials; <br />therefore, all of the material stockpiled in the temporary fill will remain at the conclusion of the project as <br />shown on Map 19C. No excess spoil is anticipated for the mining and development of the Collom Lite or <br />Little Collom X Pits. Additional discussion of the temporary spoil pile can be found under Section <br />2.05.3(6). <br />CONSTRUCTION PLAN <br />All available topsoil will be removed and either stockpiled for later use or direct haul replaced to a <br />reclaimed area. No excess spoil is expected under the current Mine Operation Plan. Should disposal of <br />excess spoil be anticipated, a construction plan will be developed. The construction plan will follow <br />methods approved in the previously approved permit. <br />INSPECTION PLAN <br />Collom — Rule 4, Page 22 Revision Date: 1/23/09 <br />Revision No.: PR -03 <br />