RULE 2 PERMITS <br />Topsoil stockpile locations and extent of stripping is presented in Topsoil Handling Map (Map 28C). <br />Annual stripping polygons are identified on Map 23B. The overall life -of -mine topsoil balance is <br />estimated in Table 2.04.9 -16. It should be stressed that these yearly figures are estimates and can only be <br />useful as a general guide to topsoil removal or replacement during any given year. In 2006, TR -62 was <br />approved to modify topsoil redistribution depths. The revision also includes a requirement to annually <br />report topsoil stockpile volumes (Volume 1, Section 2.05 "Topsoil Redistribution Plan "). This <br />commitment to provide topsoil volumes in the annual report also applies to the Collom Revision area <br />covered under PR -03. As TR -82 was approved in 2010, similar language allowing the replacement of <br />variable topsoil depths has been included in this revision. <br />All yardage and acreage figures were calculated based upon the assumption that topsoil would be <br />removed in advance of mining activities as shown on the Mine Plan Map (Map 23B). <br />The stockpiling of topsoil will continue until all pit development has progressed to its maximum extent. <br />Areas available for final reclamation prior to mine closure consist primarily of backfilled pit areas. <br />Topsoil to cover these areas will either be direct placed from areas of topsoil removal activities or topsoil <br />will be hauled from the topsoil stockpiles. Direct placement of topsoil will be the preferred method, <br />however, the stockpiled material will be utilized if equipment schedules, weather conditions or other <br />operational factors make direct placement less desirable or less cost effective. After mining and regrading <br />operations have ceased, all stockpiled topsoil will be used to reclaim the remaining pit and other <br />disturbance areas. <br />Topsoil will be stored in topsoil stockpiles as shown on Map 28C. Stockpiles will be constructed with <br />outside slopes no steeper than 3H: IV. Stockpiles are specifically located to avoid erosion from wind and <br />water and additional compaction or contamination. As can be determined from the Topsoil Handling Map <br />is (Map 28C), all proposed stockpiles are located within stable areas. The piles will be protected from wind <br />erosion by planting a perennial mixture as explained in Section 4.06.3 as soon as conditions allow. Proper <br />seasons of planting will be early spring or late fall. In addition to the planted material, a considerable <br />amount of volunteer growth can be expected to grow on all stockpiled topsoil. <br />External erosion will be controlled through proper location of the stockpiles. No topsoil stockpiles will be <br />placed in a drainage bottom where external erosion might pose a potential threat. <br />Unnecessary compaction will be avoided by keeping all but essential traffic off the stockpiled areas. <br />Topsoil signs will identify topsoil stockpiles. Contamination of the stockpiles will be eliminated by the <br />careful selection of sites that are distant from the areas where actual mining activities are occurring. <br />Drainage ways and areas near spoiling and blasting will be avoided where possible. <br />2.05.3 (6) Overburden <br />Additional description of the removal, handling and storage of overburden material within the permit area <br />is described under the Production Methods Section found at the beginning of Section 2.05.3. The spoil <br />handling monitoring plan parameters for the operation can be found below. <br />Overburden Monitoring Program <br />Tables 2.04.6 -6 and 2.04.6 -7 summarize oberburden analyses from the Collom expansion area based on <br />marginal and unsuitable criteria found on Table 2.04.6 -5 (WDEQ -LQD). Descriptive information <br />regarding the exploration test boring program under sections labeled "Evaluating Geochemical Properties <br />of Overburden" and "Exploration Test Boring Results Summary" provide additional support to the <br />discussions below. <br />Collom - Rule 2, Page 95 Revision Date: 1/23/09 <br />Revision No.: PR -03 <br />