My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-12-17_REVISION - C1981019 (108)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2010-12-17_REVISION - C1981019 (108)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:28:02 PM
Creation date
12/29/2010 4:19:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
12/17/2010
Doc Name
Rule 2.05 Operation and Reclamation Plans
Type & Sequence
PR3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 2 PERMITS <br />It is anticipated that on slopes of < 10% it will be safe to strategically place rows of topsoil in a <br />designated pattern with haul trucks to ensure the desired four to six inches of topsoil can be dozed into <br />position. If a dozer operator doesn't do this properly, he won't have enough material to cover the entire <br />area and it will be obvious what has occurred. Depth control on the Sagebrush Steppe areas will be <br />verified as the project progresses and any deviations from the plan will be rectified at that time. Depth <br />readings will also be taken after the area has been completely topsoiled, sufficient to ensure that Colowyo <br />can demonstrate compliance with the plan. Even if scrapers are used to initially lay topsoil down, it is <br />anticipated that some dozer work will be needed to do the finish work. The required volume of material <br />will be at/on the location. Verification work will lead to additional dozer /scraper work if necessary to <br />ensure proper final placement. If depth control becomes an issue, staking will be initiated as an additional <br />guide for operators. <br />On areas of > 10% slope it is anticipated that dozers will work together with scrapers to accomplish a <br />gradually thicker application of topsoil on these slopes. As Colowyo has always done, depth stakes at <br />regular intervals will provide guidance to the operators. Depth readings will be taken while the <br />operations are progressing and any issues will be rectified at that time. Depth readings will also be taken <br />after the area has been completely topsoiled, sufficient to ensure that Colowyo can demonstrate <br />compliance with the plan. The allocated volume of topsoil for each area will be hauled to the location, <br />most likely with haul trucks and scrapers as close as safely possible to the final intended location, then <br />dozed into place or placed via scrapers. Verification work will lead to additional dozer /scraper work if <br />necessary to ensure proper final placement. <br />Colowyo will institute a topsoil depth verification program to document ecologically significant <br />variations in topsoil where applicable (i.e. grazingland areas) and confirm more uniform topsoil <br />reapplications (i.e. sagebrush steppe areas). It will consist of recording topsoil depths on five acre centers <br />overlaid on each reclamation unit, similar to re- graded overburden suitability monitoring. Specific depth <br />sampling point locations and results will be recorded and reported in the subsequent years Annual <br />Reclamation Report within the Topsoil Volume Inventory section. The topsoil depth verification program <br />is not intended nor should it be used as a topsoil volume verification method as the volume of topsoil will <br />be planned, monitored and verified through load count, time card coding and engineering plan designation <br />of placement of the material on a reclamation unit basis. Overall topsoil balance oversight is performed <br />and reported annually in the Annual Reclamation Report. The overall goal of both the Division and <br />Colowyo is to replace the entire resource in a manner that promotes the likelihood reclaimed areas will <br />meet the success criteria for Phase III Bond Release after the required liability periods and thereby create <br />reclaimed lands that reflect the desired post -mine land use (grazingland and sagebrush steppe). <br />Reapplied topsoil will be left in a rough condition to help control wind and water erosion prior to seeding. <br />In the case of scraper - applied topsoil, dozers usually cross -rip along slope contours at intervals of about <br />50 -75 feet to provide additional surface roughness. Also, contour furrows are almost always put in place <br />when scrapers are utilized to minimize any sheet flow from the topsoil surface. Due to the specific <br />equipment used for the Sagebrush Steppe areas, topsoil will be left in a more smooth condition to ensure <br />proper seeding depth as described in the text. Any topsoil put into final position with a dozer will by <br />practice be in a state of rough condition. Previous roughening efforts at Colowyo have been extreme, <br />leading to difficulties in placing seed at biologically viable depths. The addition of more contour furrows <br />will reduce sheet flow and moderating the roughness will allow a greater percentage of seed to germinate <br />and provide ground cover that will also alleviate rilling and sediment control issues. As Coloywo <br />transitions into areas of steeper slopes, density of cross ripping will be tightened to increase surface <br />roughness and more contour furrows will be used to break up the slopes and minimize sheet flow <br />conditions and reduce any concentration of flow from rain /snowmelt events. Seedbed preparation, other <br />surface manipulation practices and seeding will be completed primarily during the fall months. Contour <br />Collom — Rule 2, Page 103 Revision Date: 1/23/09 <br />Revision No.: PR -03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.