My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-12-17_REVISION - C1981019 (108)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2010-12-17_REVISION - C1981019 (108)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:28:02 PM
Creation date
12/29/2010 4:19:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
12/17/2010
Doc Name
Rule 2.05 Operation and Reclamation Plans
Type & Sequence
PR3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 2 PERMITS <br />2.05.4 (2)(c) Backfilling Plan <br />1W As mining progresses to the south, overburden material from each successive cut will be backfilled into <br />the previously mined out area and the additional spoil will continue to buildup in previously mined areas. <br />Initially a temporary out of pit spoil pile will be created to the North of the Collom Lite Pit and will <br />remain in place until the end of mine life. Table 2.05.6 -5 presents a mine wide volumetric calculation in <br />support of post mining topography and illustrates that permanent out of pit spoil will not be needed. <br />The backfilled mining areas will be graded to establish a stable post mine topography that blends into the <br />undisturbed areas outside the mining limits (Map 19C). Colowyo will grade all final slopes so that overall <br />grades do not exceed 3H:1 V (Map 20C). <br />Where necessary, the spoil surface will be roughened by ripping or discing etc., to ensure a bond between <br />the topsoil and spoil to reduce slippage. To date there is no evidence of topsoil slippage on reclaimed <br />areas in the existing permit area. A few small tension cracks resulting from settling of fill and topsoil <br />have occurred in a few areas within a year or two after reclamation, but soon stabilize and begin to fill in. <br />The final surface as shown on the Post - mining Topography Map (Map 19C) will approximate the overall <br />pre- mining grades (Map 19D). Appropriate cross sections that show the anticipated final surface <br />configuration of the proposed permit area, in conjunction with the existing pre- mining topography, are <br />shown on the Pre - mining and Post - mining Cross Section (Map 20C). <br />The regrading plan reestablishes escape cover, south facing slopes for wintering big game populations <br />and small drainages suitable as future location of stockponds necessary to achieve the post- mining land <br />use. <br />2.05.4 (2)(d) Topsoil Salvage <br />Topsoil Redistribution Plan <br />Prior to any mining - related disturbances in the Collom area, all available topsoil will be removed from the <br />site to be disturbed as discussed in Section 2.05.3, and will be redistributed or stockpiled as necessary to <br />satisfy the needs of the reclamation timetable as described herein. <br />Final grading before topsoil placement will be conducted in a manner that minimizes erosion and <br />provides a surface for the topsoil that minimizes slippage. If spoil compaction is a problem, the spoil will <br />be ripped with a dozer to minimize compaction, assure stability and minimize slippage after topsoil <br />replacement. Where possible, development of concave landforms (to encourage snow entrapment) will <br />be developed on a case -by -case basis at the discretion of the field supervisor. Such landforms will still <br />have positive drainage in accordance with overall permitted designs. Topsoil will then be redistributed <br />and graded to a variable replacement depth following the general rule of thin topsoil ( <6) inches on ridge <br />tops to gradually thicker topsoil moving down the slopes to the drainage bottoms for the grazingland land <br />use targeted areas (see representation below). Sagebrush Steppe areas will ideally receive an average of <br />approximately 4 inches of topsoil that will likely be a more uniform application to encourage proper <br />seeding depth and overall shrub establishment conditions (see representation below). Colowyo will track <br />the volume of topsoil applied to each reclamation unit and report it within the Annual Reclamation Report <br />each year. Colowyo utilizes load counts and time card coding to differentiate and accurately assign <br />costs /volumes for all other material movement on the mine site. As such, Colowyo will utilize these tools <br />to ensure the planned and appropriate volume of topsoil is applied to each reclamation unit in the Collom <br />Area. A visual representation of Colowyo's Collom area drainage -wide topsoil replacement strategy is <br />provided below: <br />Collom —Rule 2, Page 101 Revision Date: 1/23/09 <br />Revision No.: PR -03 <br />