2010-12-17_REVISION - C1981019 (108)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2010-12-17_REVISION - C1981019 (108)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:28:02 PM
Creation date
12/29/2010 4:19:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
12/17/2010
Doc Name
Rule 2.05 Operation and Reclamation Plans
Type & Sequence
PR3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 2 PERMITS <br />revisions were submitted to the Division and approved on January 24, 1984, August 17, 1983, April 24, <br />1990, and PR -02 respectively. The following summarizes the requirements of the current regraded <br />overburden (backfill) sampling program and supersedes all previous commitments. It is based on the <br />following limitations of the earlier program. <br />1. Placing weathered overburden material onto reclamation areas prior to final regarding, and <br />2. Sampling regraded overburden at a density of one composite surface sample per 5 acres of <br />regraded spoil. <br />The regrading of overburden is an event that takes place sporadically during the year. Once backfill areas <br />are regraded, but prior to topsoil replacement, the new locations are identified and sampled. A life -of- <br />mine sampling grid has been established on 500 -foot centers, and each sample location on the grid <br />corresponds to a letter /number combination as established on the sampling map. Using this grid interval, <br />each sample location represents an area of about 5.7 acres in size. A hand shovel is used to take small, <br />representative surface samples of spoil across the sample area. <br />Regraded Overburden Suspect Levels: <br />Parameter <br />Suspect Level <br />H <br />Less than 5 or greater than 9 standard units <br />Electrical Conductivity <br />Greater than 12 millimhos /cm <br />Sodium Absorption Ratio <br />Greater than 15 <br />The laboratory results are kept at the mine site. Results of the sampling program are provided in the <br />appropriate Annual Reclamation Report and are periodically checked during CDRMS quarterly complete <br />inspections. <br />The mining sequence for the planned operation is shown on the Mine Plan Map (Map 2313). Cross <br />sections showing the post mining pit backfill are presented on the Pre - Mining and Post - Mining Cross <br />Sections (Map 20C). The temporary overburden stockpile location is presented on Map 23B. The map <br />depicting spoil grading is presented as Map 29B. <br />The temporary overburden stockpile that is to be built will be placed in a stable location that will not <br />exceed a 33 percent slope to ensure stability. The spoil suitability and special handling procedures are <br />described in detail in section 2.05.3(1) of the Collom permit revision. The initial development of the <br />stockpile is anticipated to begin during the year 2012 with the excavation of the initial box cuts and <br />continue over the next five years of operation. Following this period mine pit advancement will allow for <br />placement of mined spoil into the original box cut area. <br />The temporary spoil pile will be used to fill and recontour the final pit sequence in the final two years of <br />mining activities (See Map 29C — Temporary Spoil Pile Design). Out of pit stored spoils will be used in <br />the construction of the post mine topography. Approximately 250 million cubic yards of storage capacity <br />for the temporary spoil stockpile will be needed. <br />The toe of the fill will be placed near the floor of the X4 coal seam and the stockpile will eventually <br />extend upward about 775 feet in thickness to an elevation of 7675. The stockpile will remain in place <br />until the last few years of mining and will have a life of about 15 -20 years depending on production rates. <br />Construction of the stockpile is expected to take about 7 to 10 years. As such, the lower portions of the <br />stockpile will be completed and stabilized before the top is completed. To ensure that a phreatic water <br />surface does not develop during the life of the stockpile, a rock drain will be installed at the base of the <br />Collom — Rule 2, Page 98 Revision Date: 1/23/09 <br />Revision No.: PR -03 <br />