My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-12-29_HYDROLOGY - C1980001 (2)
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1980001
>
2010-12-29_HYDROLOGY - C1980001 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:28:22 PM
Creation date
12/29/2010 2:24:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
HYDROLOGY
Doc Date
12/29/2010
Doc Name
4th Qtr 2010 Impoundment Inspection Report
From
WWCEngineering
To
DRMS
Permit Index Doc Type
Sediment Pond Inspect
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
^WWCENGINEERING <br />61 1 Skyline Road - Laramie, WY 82070 - (307) 742-0031 <br />FAX (307) 721-2913 - E-mail: infolar@wwcengineering.com <br />December 27, 2010 <br />Janet Binns <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203-2273 <br />RE: Edna Mine; Fourth Quarter 2010 Impoundment Inspection Report <br />Dear Janet Binns: <br />RECEIVED <br />DEC 29 2010 <br />Division of r?aciamat <br />Mining and Safety <br />This letter constitutes the Fourth Quarter 2010 Impoundment Inspection Report for the Edna <br />Mine; Permit No. C-80-001. This report covers the time period from October 1, 2010 to <br />December 31, 2010. The inspections were performed on November 10, 2010 by Field Inspector <br />Chris Miller. The site was covered with snow. All structures were functioning as designed at <br />inspection. <br />The Impoundment Location Map details the location of each impoundment inspected <br />(Attachment A). Quarterly Pond Inspection Reports document water level, sediment level, <br />outflow, and required maintenance cited per inspection (Attachment B). As described on the <br />2010 Maintenance List, there is currently no required maintenance at the Edna Mine, <br />(Attachment C). <br />Should you have any questions regarding this material, please contact me at your convenience. <br />Sincerely, <br />Troy ers <br />Project Manager <br />TNS <br />Attachments (A, B & C) <br />File: 99-144 <br />cc: Leach <br />Permit
The URL can be used to link to this page
Your browser does not support the video tag.