Laserfiche WebLink
LIST OF ATTACHMENTS <br />(Continued) <br />Attachment No. <br />13-12 Pit Slope Stability Analysis <br />LIST OF EXHIBITS <br />Exhibit No. <br />13-1 Facilities Map <br />13-2 Surface Hydrology <br />13-2A Eliminated <br />13-3 Surface Water Control Plan - Tie-Across Haul Road <br />13-4 Watershed Boundary Partial <br />13-5 Proposed Sedimentation Pond 005 <br />13-5A Pond 005 As-Built <br />13-6 Pond 006 Phase II As-Built <br />13-6A Pond 006 Phase IV Subwatershed Map <br />13-6B Pond 006 Phase IV Design <br />13-6C Pond 006 Phase IV Pre-Settling Basin Design <br />13-6D Pond 006 Phase V Subwatershed Map <br />13-7 Proposed Sedimentation Pond 009 <br />13-7A Sedimentation Pond 009 As-Built <br />13-8 Proposed Sedimentation Pond 015 (2 sheets) <br />13-8A Proposed Sedimentation Pond 016 (2 sheets) <br />13-8B Proposed Sedimentation Pond 017 (2 sheets) <br />13-8PP Topsoil Stockpile PP Sumps PP-Sl and PP-S2 (As-Built) <br />13-8QQ Topsoil Stockpile QQ Sump QQ-S1 (As-Built) <br />13-8RR Topsoil Stockpile RR Sump RR-S1 (As-Built) <br />13-9 Pond 15 As-Built <br />13-9A Pond 16 As-Built <br />13-9B Pond 016 Design Revision <br />13-9C Pond 016A (As-Built) <br />13-9D Pond 017 (As Built) <br />13-9E Pond 016 & 016A Two-Pond System As-Built Watershed Boundary <br />13-10 Typical Road Details <br />13-11.1-11.8 Tie-Across Haul Road (As-Built) <br />TR-62 iii Revised 03/09