Laserfiche WebLink
Ground Cover Transact VO, W <br />(Set -up points at l- rn )n ervaro) <br />a <br />Lard /Point - Intercept Bar <br />7T (Intercept. at 10 cm Intervals - <br />a `urG notep•tn of "beams "Iw "Itiro" <br />^ z on ground cover) <br />C Note 10.0 -up poinro pd <br />trareoct wan "intercepts <br />I per set -up point results In <br />,1 ® �11L `1Y IM inferceProper transact <br />qb <br />e 11( dY` <br />i <br />l 7ftan- r (ShnVn ➢ Poln <br />latPoint) unit — t Unit Lahr aw <br />(,�rded • L • • ryJ ro Fl. Grid ` }T <br />Grid <br />FILM <br />fleterance <br />Systematic Samvle Site (eg. F.nc. Coma) <br />Location Procedure <br />Figure 1 <br />Sampling Procedure at a Systematic Sample Site Location <br />CEDAR (REEK ASSM I % I I I I, Page 6 Colomo Coal Company <br />2009 Phase 11 Evaluation (Updated Dec -10) <br />