Laserfiche WebLink
December 22, 2010 <br />Horse Gulch Fill Quarterly Inspection Report <br />Fourth Quarter of 2010 <br />Table of Contents <br />1.0 Introduction <br />2.0 Critical Construction Periods <br />2.1 Removal of All Organic Material and Topsoil <br />2.2 Placement of Underdrainage Systems <br />2.3 Installation of Surface Drainage Systems <br />2.4 Placement and Compaction of Fill Materials <br />2.5 Revegetation <br />3.0 References <br />I certify that this report was prepared by me. <br />o?pp0 LICFNs <br />???,• ?? STIN AGl FQ <br />41406 <br />o??sS?ONAL ???\ <br />PROFESSIONAL SEAL <br />eth Austin Puls <br />CO PE 41406 <br />Engineering Coordinator <br />Trapper Mining, Inc. <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />3 <br />4 <br />1