Laserfiche WebLink
Page 2. <br />NECC response: The text narrative on page 2.05-44 and figure 13a on page 2.05-44a <br />has been modified. Map 11 New Elk Mine Site Plan East Portal Sheet 3- Facilities <br />has been modified. <br />2. Information regarding how the 100-year 24-hour storm runoff will be diverted from <br />above (north) of the DWDA was not provided. Please provide updates to text <br />narrative, Table 20(page 2.05-11), Table 21(page 14-14a), and Map 13, as <br />necessary, to clearly and accurately show storm water diversion as required by <br />Rule 4.09.2(7) and 4.10.3(2). <br />NECC response: The storm waters above the DWDA are diverted by D-1 Ias <br />described on pages 2.05-10-10c. Figure 2e includes the detail of the storm water <br />routing. <br />3. Considering the revisions to Map 11 as a result of TR-54, please ensure that all TR- <br />53 maps are consistent with those changes and updates. <br />NECC response: Map 11 New Elk Mine Site Plan East Portal Sheet 3- Facilities <br />from TR-54 has been modified to show the DWDA. <br />If you have any questions please contact me. <br />Sincerely, <br />? l <br />Ron Thompson, Mine Manager <br />Attachment: <br />Revised pages 2.05-10, 1 Oa, IOb, IOc, 44a, 44b, 46a <br />List of Figures <br />Map 11 New Elk Mine Site Plan East Portal Sheet 3- Facilities has been modified.