My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-15_REVISION - M1980244 (189)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-11-15_REVISION - M1980244 (189)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:28 PM
Creation date
12/27/2010 10:41:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/15/2010
Doc Name
QA Monitoring and Test Results- 2010, VOL. II, Appendix D, Weekly Reports, Part 4
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ame <br />Earth $ Environmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: August 1, 2009 <br />Project No.: 84201125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day/Night <br />Reporting Period: 07/26/09 through 08/01/09 <br />Days S M T W T F S <br />Work Shifts D D D D D - <br /> <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: 42°F to 46°F (+/-) High: 61 ° F to 74°F (+/-) <br />AMEC CQA: Personnel On-site through the Reporting Period (See Attachment A). <br />AMES: No delays due to weather. Ames has suspended night shift construction activities for the next two <br />weeks. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />II) EARTHWORKS <br />A) Clearing and Grubbing <br />1) VLF <br />Tree removal from the east slope of the Phase 5 VLF footprint continued using a CAT 345 <br />excavator and 40-ton articulating haul trucks. The removed trees and slash were placed in the <br />Dump 4 slash stockpile. <br />B) Topsoil Relocation <br />1) VLF <br />Topsoil relocation was performed using a John Deere 850 excavator to load 40-ton articulating <br />haul trucks northeast of the existing substation. The topsoil was hauled to the lower topsoil <br />stockpile, south of the LOB Delivery Road. A CAT D-6 dozer was used to maintain the <br />stockpile. <br />C) Subgrade Preparation <br />1) VLF <br />Subgrade preparation was performed between stations A30+00 (+/-) and A34+00 (+/-), <br />approximately 200 to 300 feet left of centerline and between stations J9+00 (+/-) and J13+00 <br />(+/-), approximately 200 to 300 feet left of centerline. A CAT D-9 dozer was used to rip the <br />subgrade surface to a depth of 6" to 8". The subgrade was then moisture conditioned using a <br />CAT 773 water tuck (when necessary) and compacted using a 10-ton vibratory smooth drum <br />Sheet 1 of 8 <br />VLF Weekly Report WE 08.01.09.D.doc
The URL can be used to link to this page
Your browser does not support the video tag.