amen <br />Earth & Environmental <br />truck (when necessary). Each lift was compacted with a 10-ton smooth drum vibratory <br />compactor passing over the entire surface at least 4 times (method compaction technique is <br />applicable). <br />Structural fill was placed between stations K8+00 (+/-) and K14+00 (+/-), approximately 100 <br />to 300 feet right of centerline. Structural fill was placed using CAT dozers in 18" to 24" lifts <br />(based on rock size). Moisture conditioning of the fill was performed using a CAT 773-water <br />truck (when necessary). Each lift was compacted with a 10-ton smooth drum vibratory <br />compactor passing over the entire surface at least 4 times (method compaction technique is <br />applicable). <br />Drilling and blasting was performed between stations A6+50 (+/-) and A8+50 (+/-), <br />approximately 20 to 75 feet right of centerline and between stations Al 1+50 (+/-) and A12+00 <br />(+/-), approximately 20 to 75 feet right of centerline. Drilling was performed using two track <br />mounted drill rigs. The area between A6+50 (+/-) and A8+50 (+/-) was shot Friday, 8/14/2009. <br />H) Material Processing <br />1) South Cresson Clay Processing Area <br />Processing of Soil Liner Fill material continued at the South Cresson Clay Processing area. A <br />CAT D-6 dozer, a CAT 330 excavator, and a CAT 966 front-end loader were used to process <br />the material. <br />Location This (tons) Cumulative Comments <br />So Cresson Clay Processing 7,878 66,961 <br />Squaw Gulch Processing 0 35,816 Processing in area complete. <br />Total 7,878 102,777 <br />I) New ADR Water Tank <br />The trench for the new ADR waterline was performed from stations A22+50 (+/-) working toward <br />the northeast using a CAT 345 excavator. Pipe bedding was hauled from the Arequa Process area <br />to the trench using 40-ton articulating haul trucks loaded by a CAT 966 front-end loader. The <br />bedding was placed in the bottom of the trench and compacted using the excavator bucket (CEntry <br />specification). <br />Ten-inch HDPE pipe was fused for the new ADR waterline at the Ames lay down yard. <br />Approximately 200-foot runs were fused and will be placed in the trench at a later date. A CAT <br />966 front-end loader and a CAT 345 excavator were used to assist the fusion. <br />.l) Miscellaneous <br />No work performed during the week. <br />III) Underground Workings <br />A) Drilling <br />No work performed during the week. <br />VLF Weekly Report WE 08.15.09.D.doc