My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-15_REVISION - M1980244 (174)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-11-15_REVISION - M1980244 (174)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:28 PM
Creation date
12/23/2010 1:27:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/15/2010
Doc Name
QA Monitoring and Test Results- 2010, VOL. II, Appendix D, Weekly Reports, Part 2.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec'O <br />Earth & Environmental <br />E) Subgrade Preparation <br />1) VLF <br />No work performed during the week. <br />F) Material Processing <br />1) South Cresson Clay Processing Area <br />Soil Liner Fill production for the VLF continued at the South Cresson Clay Processing area. <br />Location This Week Couimulative Comments <br />So Cresson Clay Processing 19,232 38,131 <br />Squaw Gulch Processing - 35,816 Produced and stockpiled <br />Total 19,232 73,947 <br />G) Miscellaneous <br />No work performed during week. <br />III) Underground Working <br />A) Drilling <br />No work performed during the week. <br />B) Mine Shaft/Stope Remediation <br />No work performed during the week. <br />C) Lateral/Slot Remediation <br />No work performed during the week. <br />IV) Storm Water Management Structures <br />A) Control Structures <br />No work performed during the week. <br />B) Best Management Practices <br />Best Management Practices are being observed throughout the VLF Phase 5 Project. <br />V) VLF Geosynthetics <br />The Geogrid was relocated to Ames lay-down yard. No damage was observed. <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed placement of structural fill at the PSSA haul road between stations K1+00 (+/-) and <br />K8+50 (+/-), right and left of centerline, 0-40-feet. <br />Sheet 3 of 6 <br />VLF Weekly Report WE 05.16.09.D.doc
The URL can be used to link to this page
Your browser does not support the video tag.