My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-15_REVISION - M1980244 (174)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-11-15_REVISION - M1980244 (174)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:28 PM
Creation date
12/23/2010 1:27:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/15/2010
Doc Name
QA Monitoring and Test Results- 2010, VOL. II, Appendix D, Weekly Reports, Part 2.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Affy& <br />ame <br />Earth & Environmental <br />3. Sediment Collection Pond <br />Additional rock has been transported to the Joe Dandy Main Cresson backfill. <br />D. Cut to Fill <br />1. VLF <br />No work performed during the week. <br />2. VLF, PSSA Haul Road <br />No work performed during the week. <br />3. Sediment Collection Pond <br />No work performed during the week. <br />E. Subgrade Preparation <br />1. VLF <br />Earlier in the week between stations F 10+00 (+/-) and F8+00 (+/-) from 0- 200 feet <br />right of centerline of the North Crest PSSA road, AMES has ripped and prepared the <br />subgrade for structural method specification fill to resume. <br />2. Sediment Collection Pond <br />Slope contouring and subgrade work has been completed during the week. <br />F. SLF Processing (Material is being generated/processed for the LOB and the VLF) <br />Production of the clay material located in SGOSA (Squaw Gulch Overburden Storage <br />Area) Dump 5. <br />The material screening plant located at the AGOSA (Arequa Gulch Overburden Storage <br />Area) completed processing the Drain Cover Fill from material delivered by CC&V Mine. <br />Materials for both the LOB and VLF have resumed production. <br />The mine has transported clay to the South Cresson clay stockpile intermittently throughout <br />the week. <br />Location This Week Cumulative Comments <br /> (tons) (tons) <br />SGOSA Dump 5 Clay 7,572 35,068 Total includes through Apr. 20, `09 <br />Processing <br />Totals 7,572 35,068 <br />G. Miscellaneous <br />Work continued on the 9775 VLF bench widening on the existing Phase IV VLF for the <br />planned relocation of the existing solution lines. Widening of the bench and laying the <br />slopes back to approximately 2H: IV. Excess ore transported to the Phase IV ore heap <br />using 4-Volvo haul trucks. Work was completed this past Thursday. <br />Sheet 2 of 6 <br />VLF Weekly Report WE 04.18.09.D
The URL can be used to link to this page
Your browser does not support the video tag.