My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-15_REVISION - M1980244 (174)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-11-15_REVISION - M1980244 (174)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:28 PM
Creation date
12/23/2010 1:27:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/15/2010
Doc Name
QA Monitoring and Test Results- 2010, VOL. II, Appendix D, Weekly Reports, Part 2.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amedly <br />Earth & Environmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: April 11, 2009 <br />Project No.: 8420125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day/Night <br />Reporting Period: 04/05/09 through 04/11/09 <br />Days S M T W T F S <br />Work Shifts - D D D D D - <br /> - N N N N N - <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: 25°F to33°F (+/-) High: 38° F to 45°F <br />AMEC; CQA: Personnel On-site through the Reporting Period (See Attachment A). <br />AMES, No weather related delays. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />1. EARTHWORKS <br />A. Clear and Grubbing <br />1. VLF <br />Ames continued clearing and grubbing activities earlier in the week, below the East <br />Perimeter Access Road. Pioneer roads are constructed for access. Ames used one CAT <br />345 track excavator to consolidate grubbed material for loading. Work has advanced <br />down slope to from stations A8+00 (+/-) to H4+00 (+/-) and E20+00 (+/-) to E14+00 <br />(+/-). Work has concentrated within the southeast area of the pad. <br />2. VLF, PSSA Haul Road <br />Work is complete from station K10+00 (+/-) to K4+50 (+/-). <br />3. Sediment Collection Pond <br />Work is complete. <br />B. Stripping <br />1. VLF <br />South approximately 50 to 150-feet from centerline of the North Crest PSSA Road <br />between stations 1710+00 (+/-) and 178+00 (+/-) topsoil has been stockpiled for future <br />removal. The existing area is stripped of all unsuitable material in preparation for the <br />continuation of the VLF structural fill. <br />2. VLF, PSSA Haul Road <br />Work is complete from station K10+00 (+/-) to K4+50 (+/-). <br />Sheet 1 of 8 <br />VLF Weekly Report WE 04.11.09.D
The URL can be used to link to this page
Your browser does not support the video tag.