amec <br />Earth & Environmental <br />Work has continued on the 9775 bench widening for the relocation of the existing solution piping. This <br />work is advancing to the north and appears to be nearing completion. <br />Testing Summary <br />Laboratory testing continues (Gradations, Atterberg Limit, and Moisture-Density Relationships) for <br />previously sampled materials, throughout the shift. Permeability testing continues at an off-site <br />laboratory. A sample of clay for testing was obtained from the South Cresson stockpile. (SLF-21-C). <br />Testing is in progress. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No Concerns <br />Summary of Non-conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC& V.• <br />CC&V held a Weekly Contractors' meeting on March 24, 2009. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. <br />Ames Construction: <br />Daily safety meetings are performed prior to each shift. These have been used to discuss work areas, <br />procedures, testing requirements, etc with the Ames supervisors and equipment operators. . <br />AMEC and Ames discussed daily work activities during the week and procedures for fill placement. <br />AMEC: <br />Derek W, Project Manager - General project status. <br />Others: <br />None <br />Summary of Incidents/Accidents/Health & Safety Issues <br />None noted. <br />Sheet 4 of 7 <br />VLF Weekly Report WE 03.28.09.D