My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-15_REVISION - M1980244 (125)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-11-15_REVISION - M1980244 (125)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:28 PM
Creation date
12/23/2010 12:56:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/15/2010
Doc Name
QA Monitoring and Test Results- 2010, VOL. II, Appendix D, Weekly Reports, Part 1
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec <br />Earth & Environmental <br />Summarv of SLF Drocessinc <br />Location This Week Cumulative Comments <br /> (tons) (tons) <br /> The plant has been down or limited <br />LOB Plant (Dump 5) 3,001 23,600 production this week. <br />Totals 3,001 23,600 <br />G. Miscellaneous <br />Continue work on the 9775 VLF bench widening on the existing ore heap. For the future <br />planned relocation of the existing solution lines. <br />II. Underground Working <br />A. Drilling <br />No work this week. <br />B. Mine Shaft/Stope Remediation <br />No Activities <br />C. Lateral/Slot Remediation <br />No Activities <br />III. Stormwater Management Structures <br />A. Control Structures <br />No Activities <br />IV. VLF Geosynthetics <br />A. LLDPE Geomembrane 80 mil and 100 mil <br />Poly-Flex delivered 28 rolls of 100 mil single-sided textured LLDPE and 5 rolls of 80 mil <br />smooth LLDPE. Delivery was this past Wednesday and Thursday. All rolls were <br />inventoried and observed for damage. No apparent damage was observed during transport. <br />The rolls are stored at the Arequa Processing Pad. All mil certifications are in compliance. <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. Field observations within the northwest portion of the VLF included stripping <br />of all frozen and unsuitable materials and placement of structural fill by method spec. as outlined in the <br />Project Documents. <br />Clay processing was intermittent due to mechanical problems with the clay plant located in Dump 5. <br />The materials processing plant located in Arequa Process Area has been in production all week. The <br />screening plant is producing 5 different materials types. <br />Work has continued on the 9775 bench widening for the future re-location of the existing solution piping. <br />Sheet 3 of 8 <br />VLF Weekly Report WE 03.14.09.D
The URL can be used to link to this page
Your browser does not support the video tag.