My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-15_REVISION - M1980244 (125)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-11-15_REVISION - M1980244 (125)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:28 PM
Creation date
12/23/2010 12:56:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/15/2010
Doc Name
QA Monitoring and Test Results- 2010, VOL. II, Appendix D, Weekly Reports, Part 1
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec <br />Earth & Environmental <br />• Ames continued setup of a materials screening plant to process construction <br />materials. Setup was completed by the end of the week. Start-up of the material <br />processing plant commenced on Friday for the production of 5-required <br />materials. The plant is located at "Arequa Process Area" northwest of Ames <br />maintenance area. <br />Q,,.. ?.,n..I -PCT L'i --aoeinrr <br />`-- ' J - r - <br />Location o <br />This Week <br />(tons) <br />Cumulative <br />(tons) <br />Comments <br /> A total of 11 samples of process <br />LOB Plant (Dump 5) 5,510 17,509 and non processed clay were taken <br /> for testing. Tests are in progress. <br />Totals 5,510 17,509 <br />G. Miscellaneous <br />• No Activities <br />II. Underground Working <br />A. Drilling <br />• Rockbreakers have completed drilling within the planned sediment collection pond area <br />• Drilling was completed in the vicinity of the Thompson and Kitty Lane shafts, adjacent <br />to the electrical sub-station. <br />• One rig still down for repairs. <br />B. Mine Shaft/Stope Remediation <br />• No Activities <br />C. Lateral/Slot Remediation <br />• No Activities <br />III. Stormwater Management Structures <br />A. Control Structures <br />• No Activities <br />IV. VLF Geosynthetics <br />A. LLDPE Geomemhrane 80 mil and 100 mil <br />• Liner manufacturer began production this week and was sampled by AMEC personnel <br />Thursday the 26th of February. <br />Sheet 3 of 8 <br />VLF Weekly Report WE 02.27.09.D
The URL can be used to link to this page
Your browser does not support the video tag.