Laserfiche WebLink
ArtlL <br />&NA <br />ame <br />Earth & Environmental <br />• VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 Project No.: 8420125EO <br />Owner: Cripple Creek & Victor Gold Mining Co. Contractor: Ames Construction Co., Inc. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: 02/03/09 Reporting Period: 01/25/09 through 01/31/09 <br />Days S M T W T F S <br />Work Shifts - D D D D D - <br /> <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Lows: 2 'to 16° Highs: 13° to 5 V <br />AMEC CQA Personnel On-site through the Reporting Period (See Attachment A). <br />CONSTRUCTION ACTIVITIES AND PROGRESS: <br />• I. EARTHWORKS <br />A. Clear and Grubbing <br />1. VLF <br />• Ames began to relocate the existing topsoil currently located at approximate <br />location N51890 and E38150. The topsoil was being hauled to the lower <br />stockpile north of the five point intersection. Two Volvo Trucks and a 385 <br />excavator were being used to relocate the topsoil stockpile. <br />2. Sediment Collection Pond <br />• No Activities. <br />B. Stripping <br />1. VLF <br />• No Activities. <br />• <br />2. Sediment Collection Pond <br />• No Activities <br />C. Waste Rock to Stockpile <br />1. VLF <br />• No Activities <br />2. Sediment Collection Pond <br />• No Activities <br />Sheet 1 of 4 VLF Weekly Report WE 01.31.09.D.doc