Laserfiche WebLink
N <br />Mining Area <br />Date Inspected <br />Impoundment <br />S Pte- IC <br />-a-1 - IO <br />CUf& <br />Are there any appearances of erosion, instability, structural weakness or other <br />hazardous conditions? _ 0 <br />If yes explain: <br />Are there any existing and required monitoring procedures and instruments? VL() <br />If yes explain: <br />The depth and elevation of //a?? any i pounded waters at the time of inspection. <br />PExisting storage capacity of water in the impoundment (from principal spillway, in acre- <br />feet). g • I <br />Required storage capacity of water in the impoundment (from principal spillway, in <br />acre-feet).- -'I <br />Any other aspects of the structure affecting stability, or requiring <br />maintenance. K O <br />Has structure been maintained as designed and in accordance with the approved plan <br />and the applicable regulations? Wm" <br />If no explain <br />?P? IS <br />.......... T <br />26046 i <br />iO i N I A <br />PROFESSIONAL ENGINEERS STATEMENT <br />l state that this map was prepared <br />under my supervision and all the <br />information presented hereon is true <br />and correct to the best of my <br />knowledge and in ormat'on. <br />Z ( (o <br />Date Micha l W. Lu /o CO P.E. 26046