Laserfiche WebLink
Mining Area <br />Date Inspected <br />Impoundment <br />5e4.. - 6J <br />Are there any appearances of erosion, instability, structural weakness or other <br />hazardous conditions? KO <br />If yes explain: <br />Are there any existing and required monitoring procedures and instruments? 6 ()- <br />If yes explain: <br />The depth and elevat}'on of any imp/?unded waters at the time of inspection. <br />' L FCC r 3 A r: 1n c: b a( S" i I( W r <br />,..1 ? '=U <br />Existing storage capacity of water in the impoundment (from principal spillway, in acre- <br />feet). _ .9 <br />Required storage capacity of water in the impoundment (from principal spillway, in <br />acre-feet).- - S <br />Any other aspects of the structure affecting stability, or requiring <br />maintenance. V1 ) <br />Has structure been maintained as designed and in accordance with the approved plan <br />and the applicable regulations? <br />If no explain <br />\\\??\\\\\\111111 I i l l Illl//j//// <br />RE?? <br />W. tua: F? <br />o ' 26046 's <br />. ? F ' ? ? \ \ \ <br />AL <br />/lllllllll I I i I IIi1\\\\ <br />PROFESSIONAL ENGINEERS STATEMENT <br />l state that this map was prepared <br />under my supervision and all the <br />information presented hereon is true <br />and correct to the best of my <br />know/edge and i for at'on <br />D tf=' Mich el W. L udl , CO P. E. 26046