Laserfiche WebLink
Mining Area <br />Date Inspected <br />Impoundment <br />9-;Zo- to <br />oiAA <br />Are there any appearances of erosion, instability, structural weakness or other <br />hazardous conditions? no <br />If yes explain: <br />Are there any existing and required monitoring procedures and instruments? 40 <br />If yes explain: <br />The depth an elevation of any impo nded waters at the time of ins] <br />GJa t? Ie.ve 1 53 Leek (oel,o'o r, . s,0 <br />Existing storage capacity of water in the impoundment (from principal spillway, in acre- <br />1 _7 <br />- _Z _I O) <br />feet). G • Co rn _7 <br />Required storage capacity of water in the impoundment (from principal spillway, in <br />acre-feet).- / c <br />Any other aspects of the structure affecting stability, or requiring <br />maintenance. h 0 <br />Has structure been maintained as designed and in accordance with the approved plan <br />and the applicable regulations? <br />If no explain <br />\\\\\\\\\\?POO??I?RI l/?? <br />.? . <br />= 26046 : cr <br />L'j <br />0 ? N I I A I I I I l \ \ \ \ \\\\\ <br />PROFESSIONAL ENGINEERS S TA TEME N T <br />I state that this map was prepared <br />under my supervision and all the <br />information presented hereon is true <br />and correct to the best of my <br />knowledge and i formation. <br />joD t L6 <br />Mich el W. L ud CO P. E. 25046