Laserfiche WebLink
All stockpiles of overburden and or topsoil will be seeded to prevent erosion from <br />occurring as much as possible. All stockpiles will be located on the south side of the pit <br />and away from the riverbed. <br />Any needed refueling shall take place away from the mining area, on the haul road or <br />parking/loading area with extra care given to avoid spills. Should a spill happen, the area <br />would be cleaned by removing any soil/material to a depth of one foot or one foot more <br />than the spill has perked into the soil, and twice the size of the spill area, and removed <br />from the site and disposed according to EPA Regulations. Any spills that fall within the <br />requirement to report to Hazardous-Materials shall be reported in a timely manner, and at <br />all times any spill reporting required by any permit authority shall be followed. At no <br />time shall fuel, or any fluids required be stored on site, but may be brought in as needed. <br />At no time will any equipment enter the streambed when there is water present.