My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-12-21_PERMIT FILE - M2010083
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2010083
>
2010-12-21_PERMIT FILE - M2010083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:28:12 PM
Creation date
12/22/2010 10:57:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2010083
IBM Index Class Name
PERMIT FILE
Doc Date
12/21/2010
Doc Name
New 110c Appl.
From
Lincoln County
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C <br />BURGESS PIT <br />MINING PLAN <br />A tracked dozer or front-end loader working from north to south into stockpiles <br />will push the sand and gravel being mined in this operation. A front-end loader will then <br />load the material from the stockpile into haul trucks. Some of the sand and gravel could <br />remain in the stockpile for several weeks. The sand and gravel will be utilized in the <br />maintenance and construction of county roads in District 2 of Lincoln County. <br />Prior to removal of the sand and gravel the topsoil (0 to 8 inches) will be <br />stockpiled for later use in the reclamation of the affected lands. These topsoil stockpiles <br />will be hand seeded if necessary to stabilize the piles and prevent erosion. The 1 to 2 feet <br />of overburden that underlies the topsoil will either be used as binder or stockpiled for <br />later use in the reclamation. These stockpiles will also be hand seeded as required for <br />stabilization and to prevent erosion. The maximum size area that will be mined at one <br />time would be from 5 to 6 acres. This site will become active as soon as all permits are <br />obtained. Judging from the amount of material available this pit should be in operation <br />for about 10 to 15 years. The pit will be active but will be used fewer than 180 days per <br />year. No water will be used to produce the sand and gravel being mined nor will any <br />chemicals or explosives be used in this operation. <br />The over burden to be removed is a mix of soil and sand and gravel that gets <br />sandier with increasing depth. The sand and gravel to be mined varies in thickness from <br />10 to 12 feet. The material that under lays the sand and gravel is a mix of clay and sand <br />that turns to clay at greater depth. Some mining will occur in the channel of the Arikaree <br />River. No work will be done when water is present in the Arikaree River. <br />The primary commodity being extracted is sand and gravel. No incidental <br />products will be mined. <br />3
The URL can be used to link to this page
Your browser does not support the video tag.