My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-12-21_HYDROLOGY - M1977493
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977493
>
2010-12-21_HYDROLOGY - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:28:11 PM
Creation date
12/22/2010 10:57:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
HYDROLOGY
Doc Date
12/21/2010
Doc Name
Use of Overburden Material to Construct Temporary Land Bridge for Robinson Lake Dewatering.
From
Climax Molybdenum
To
DRMS
Permit Index Doc Type
Hydrology Report
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P <br />Climax Molybdenum <br />A Freeport-McMoRan Company <br />December 17, 2010 <br />Climax Mine <br />HWY 91 - Fremont Pass <br />Climax, CO 80429 <br />Phone (719) 486-2150 <br />Fax (719) 486-2251 <br />Eric Scott j/ IIffV? <br />Division of Reclamation, Mining and Safety DEC 112010 <br />Department of Natural Resources Dk4wo at <br />1313 Sherman St. Room 215 )?-V Mh1las a" eaw <br />Denver, Colorado 80203 <br />Re: /Use of Overburden Material to Construct Temporary Land Bridge for Robinson <br />Lake Dewaeering - - - - - - -- - - --- - <br />Dear Mr. Scott: <br />This letter is to document our phone conversation on December 14, 2010 during which I <br />described our planned use of up to 10,000 tons of coarse overburden from the E and F <br />overburden storage facilities to construct a temporary land bridge at Robinson Lake to <br />facilitate dewatering activities. As you know, Climax is removing seoinvents at Robinson <br />Lake in accordance with Technical Revision No. 16 to Permit No.,Nl-1977-493. The <br />dewatering activities are consistent with those described in Technical Revision No. 16. <br />However, due to soft ground conditions it will be necessary to temporarily place rock <br />material as a land bridge for vehicles to access portions of the soft lake bed for <br />installation of dewatering equipment. After dewatering activities are completed in the <br />next few months, Climax will remove all of the overburden material and will either place <br />it back onto the E or F overburden storage facilities, or we will place it within the <br />confines of the Tenmile tailing storage facility. As you requested, Climax will closely <br />monitor the removal activities and will minimize any slimes from the lake bed that may <br />adhere to the overburden material before it is placed back onto the overburden storage <br />facilities. <br />We appreciate the Division's guidance in this matter. Please feel free contact me at 719- <br />486-7584 with any further comments or questions. <br />Sincerely, <br />r <br />Raymond Lazuk <br />Environmental Manager <br />c: File
The URL can be used to link to this page
Your browser does not support the video tag.