Laserfiche WebLink
-3- <br />OR <br />Example: (N) 39.73691 ° <br />(W) -104.98449° <br />Latitude (N) (5 decimal places) <br />Longitude (W) - (5 decimal places) <br />OR <br />Universal Tranverse Mercator (UTM) <br />Example: 201336.3 E NAD27 Zone 13 <br />4398351.2 N <br />UTM Datum (specify NAD27, NAD83 or WGS 84) <br />Easting 22 7524.19 <br />Nad 83 <br />Zone 13 <br />Northing 41 38006.39 <br />11. Primary future (Post-mining) land use (check one): <br />Cropland(CR) EL Pastureland(PL) <br />Rangeland(RL) Forestry(FR) <br />_ Residential(RS) Recreation(RC) <br />_ Developed Water Resources(AIR) <br />12. Primary present land use (check one): <br />_ Cropland(CR) Pastureland(PL) <br />_ Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />-0-Solid Waste Disposal(WD) <br />EIGeneral Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />13. Method of Mining: Quarry (QR) Solution (SO) <br />13.1 Other: Briefly explain mining method (e.g. Placer, truck/shovel): <br />Underground mining-loaders, trucks, crushing, floatation and concentration