My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-12-16_REVISION - M2007057
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2007057
>
2010-12-16_REVISION - M2007057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:10:28 PM
Creation date
12/20/2010 11:25:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007057
IBM Index Class Name
REVISION
Doc Date
12/16/2010
Doc Name
Cost summary form
From
DRMS
To
Navajo Development Co. Inc.
Type & Sequence
SO1
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADJUSTED COSTS Ownership Costs <br /> <br />Depreciation CFC Overhead Overhaul and Operating Costs sheet 2 of 2 I <br />Overhaul Field Repair <br />Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />Acquisition cost : $8.53 NA NA NA NA NA NA NA NA NA NA <br />Econ.life -Dozer and ROPS : . $8.53 NA NA $4.71 $6.51 $5.81 $6.31 NA NA NA NA <br />-Attachment no. 2. NA NA NA $0.53 $0.57 $0.88 $0.71 NA NA NA NA <br />Annual usage : $14.03 $7.40 $6.53 NA NA NA NA NA NA NA NA <br />Double shifts : $10.52 $3.70 $3.26 NA NA NA NA NA NA NA NA <br />Triple shifts : $9.35 $2.46 $2.17 NA NA NA NA NA NA NA NA <br />Mechanic labor-Dozer and ROPS : NA NA NA $2.75 NA $3.39 NA NA NA NA NA <br />-Attachment no. 2 : NA NA NA $0.31 NA $0.51 NA NA NA NA NA <br />Fuel/lube -Dozer and ROPS : NA NA NA NA NA NA NA $14.16 $2.84 $0.00 $0.91 <br />Attachment no. 2: NA NA NA NA NA NA NA $0.00 $0.14 $0.00 $0.59 <br />ADJUSTED COST SUBTOTALS <br /> <br />Depreciation Ownership Costs <br /> <br />CFC <br /> <br />Overhead <br />Overhaul <br />Labor Parts Overhaul and Operating Costs <br />Field Repair <br />Labor Parts Fuel Lube Tires G.E.C. <br />Dozer, ROPS and Attachment no. 2: Dozer and ROPS : <br />Single shifts : $14.03 $7.40 $6.53 $2.75 $6.51 $3.39 $6.31 $14.16 $2.84 $0.00 $0.91 <br />Double shifts : $10.52 $170 $3.26 lachment no. 2 <br />Triple shifts : $9.35 $2.46 $2.17 $0.31 $0.57 $0.51 $0.71 $0.00 $0.14 $0.00 $0.59 <br />HOURLY OPERATOR WAGES Base Fringe F.I.C.A. Unempl. Wk. Comp. Total <br /> Rate Benefits 7.65% 6.20% 10.00% ($/hr) Shift Differential Colorado labor zone : 2 <br />Dozer operator (< 70hp $23.67 $9.22 $1.81 $1.47 $2.37 $38.54 Day : $0.00 Two shift per day average : $0.15 <br />Dozer operator (>=70hp $23.67 $9.22 $1.81 $1.47 $2.37 $38.54 Swing : $0.30 Three shift per day average : $025 <br />Mechanic $16.74 $4.20 $1.28 $1.04 $1.67 $24.93 Night : $0.45 <br />HOURLY EQUIPMENT COST SUMMARY Ownership Operating and Overhaul <br />Machine Attachments Operator Total <br />Cost/hr ($) <br />Single shifts : $27.95 $36.87 $2.83 $38.54 $106.19 <br />Double shifts : $17.48 $36.87 $2.83 $38.69 $95.87 <br />Triple shifts : $13.99 $36.87 $2.83 $38.79 $9248 <br />EQUIPMENT PERFORMANCE DATA <br />Description Horsepower <br />(FHP) Transmission <br />Type Weight <br />(UST) Length <br />(ft) Width <br />(ft) Height <br />(ft) Fuel <br />type Ripper <br />type <br />Dozer : Cat D6R - 6S (2003) 165 NA 20.0 16.8 8.0 10.5 diesel NA <br />Blade : Straight NA NA 2.9 NA 11.0 4.1 NA NA <br />Attachment no. 1 : ROPS Cab NA NA NA NA NA NA NA NA <br />Attachment no. 2:1 3-shank ripper NA NA 1.8 3.3 6.6 1.6 NA Parallelogram <br />Total weight :1 24.6 (UST)
The URL can be used to link to this page
Your browser does not support the video tag.