Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />PROJECT IDENTIFICATION <br />Agency or organization name: DRMS <br />Task # : 004 State : Colorado <br />Date : 1211612010 County :Mineral <br />User : RCO Site :Airport Corner Pit <br />Permit or other job action : Bond Review So-1 <br />Task description :Haul reclamation equipment to and from site <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br /> Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51 + Tons <br />Cost Breakdown : Ownership cost/hour `. $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour:, $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />NAN_POAnARLE FOUIPMENT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D6R - 6S (2003) 24.62 $24.86 $88.67 1 $113.53 $88.67 $0.00 <br />-Reveg equipment 8.00 $9.00 $88.67 1 $97.67 $88.67 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $211.20 $177.34 $0.00 <br />sheet 1 of 2 <br />Permit/job # : M-2007-057 <br />Abbreviation :none <br />Filename :M057-004