My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-12-16_REVISION - M2007057
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2007057
>
2010-12-16_REVISION - M2007057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:10:28 PM
Creation date
12/20/2010 11:25:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007057
IBM Index Class Name
REVISION
Doc Date
12/16/2010
Doc Name
Cost summary form
From
DRMS
To
Navajo Development Co. Inc.
Type & Sequence
SO1
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PROJECT IDENTIFICATION <br />Date : 16-Dec-2010 <br />User : RCO <br />Permit or job no. M-2007-057 <br />Abbreviation : none <br />Filename : M057-000 <br />Agency or organization name: DRMS <br />Permit or job action : Bond review SO-1 <br />TASK LIST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />001 -Finish grade slope and pit floor, phase 1 (East part of site) dozer 1 58.6 $6,057 <br />002 -Rip compaction on pit floor ripper 1 4.0 $476 <br />003 -Revegetate disturbed area (3 ac slope and 2.5 ac floor) revege 1 12.0 $3,698 <br />004 -Haul reclamation equipment to and from site mobilize 1 6.4 $1,277 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS: 81.0 $11,508 <br />* includes inflation factor adjustment of : NA % TOTAL DIRECT COST' $11,508 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - Liability insurance : 2.02 % of direct total = $232 <br />Performance bond : 1.05 % of direct total = $121 <br />Job superintendent : NA" NA NA total = NA <br />Profit : 10.00 % of direct total = $1,151 <br />not required (or eqp. operator serves as super.) TOTAL O & P = $1,504 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - CONTRACT AMOUNT (direct + O & P) _ $13,012 <br />Financial warranty processing (legal/related costs) : 500.00 total $ NA total = $500 <br />Engineering work and/or contract/bid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $651 <br />CONTINGENCY - NA* NA total = NA <br />contingencies accounted for at task level TOTAL INDIRECT COST = $2,655 <br /> TOTAL BOND AMOUNT (direct + indirect) _ $14,163 <br />CIRCES Cost Estimating Software <br />COST SUMMARY FORM w" <br />DEC 2 02w <br />Divieiw of R en. <br />WIMI and '04 ft <br />Site :Airport Corner Pit <br />State : Colorado <br />County:Mineral
The URL can be used to link to this page
Your browser does not support the video tag.