Laserfiche WebLink
Colorado Division of Reclamation, Mining and Safety <br />*Y <br />Reclamation Cost Summary of Only Items Not Previously Approved in PR-14 <br />Permit No. C-80-007 Prepared by: TK Date: 12/14/2010 <br />Mine name: West Elk Job action: TR-123 County: Gunnison <br />TASK LIST (DIRECT COSTS) <br />New Task no. Task description Form <br />Used Task Hours Direct Cost <br />23A ripper 4,06 $3774 <br />239 ripper 4-24 $M26 <br />23S deter 69:29 $627 <br />23B deter 9-27- $7,485 <br />23€ reveg 12 Q n $11;665 <br />239 reveg 2658 $3480 <br />23G Rip MDW pads approved in TR-123 (not previously approved in PR-14) ripper 0.00 $0 <br />23H Rip MDW roads approved in TR-123 (not previously approved in PR-14) ripper 0.34 $314 <br />231 Regrade MDW pads approved in TR-123 (not previously approved in PR-14) dozer 0.00 $0 <br />23J Regrade MDW roads approved in TR-123 (not previously approved in PR-14) dozer 2.31 $2,091 <br />23K Revegetate MDW pads approved TR-123 (not previously approved PR-14) dozer 0.00 $0 <br />23L Regrade MDW roads approved in TR-123 (not previously approved in PR-14) reveg 0.50 $972 <br />24M herehele 29 79 $47,,540 <br />23N Seal MDWs approved in TR-123 (not previously approved in PR-14) borehole 0.00 $0 <br /> <br /> GRAND TOTAL DIRECT COSTS 3.15 $3,377 <br />INDIRECT COSTS <br /> Liability insurance: 2.02% % of direct costs total = $ 68 <br /> Performance bond: 1405% % of direct costs total = $ 35 <br /> Job superintendent: 3.15 hrs. at $ 39.38 per hour total = $ 124 <br /> Profit: 10.00% % of direct costs total = $ 338 <br /> TOTAL 0 8 P= $ 565 <br /> CONTRACT AMOUNT (direct + O & P)= $3,942 <br /> Financial warranty processing (legal/related costs): NA <br /> Engineering work and/or bid preparation: 4.25% % of contract $ 168 <br /> Reclamation management and/or administration: 5600% % of contract $ 197 <br /> NA % of direct costs <br />Total indirect reclamation costs $ 930 <br />Total performance bond amount (direct costs plus indirect costs) $4,307