Laserfiche WebLink
SA ETY <br />Permit No. C-80-007 <br />Mine name: West Elk <br />TASK LIST (DIRECT COSTS) <br />New Task no. Task description <br />Form <br />Used <br />Task Hours Direct Cost <br />23A Rip MDW pads approved in TR-123 (previously approved in PR-14) ripper 4.06 $3,774 <br />23B Rip MDW roads approved in TR-123 (previously approved in PR-14) ripper 1.21 $1,126 <br />23C Regrade MOW pads approved in TR-123 (previously approved in PR-14) dozer 69.29 $62,727 <br />23D Regrade MDW roads approved in TR-123 (previously approved in PR-14) dozer 8.27 $7,485 <br />23E Revegetate MDW pads approved in TR-123 (previously approved in PR-14) reveg 12.00 $11,665 <br />23F Revegetate MDW roads approved in TR-123 (previously approved in PR-14) reveg 3.58 $3,480 <br />23G Rip MDW pads approved in TR-123 (not previously approved in PR-14) ripper 0.00 $0 <br />23H Rip MDW roads approved in TR-123 (not previously approved in PR-14) ripper 0.34 $314 <br />231 Regrade MOW pads approved in TR-123 (not previously approved in PR-14) dozer 0.00 $0 <br />23J Regrade MOW roads approved in TR-123 (not previously approved in PR-14) dozer 2.31 $2,091 <br />23K Revegetate MDW pads approved TR-123 (not previously approved PR-14) dozer 0.00 $0 <br />23L Regrade MOW roads approved in TR-123 (not previously approved in PR-14) reveg 0.50 $972 <br />23M Seal MDWs approved in TR-123 (previously approved in PR-14) 30.79 $47,540 <br />23N Seal MDWs approved in TR-123 (not previously approved in PR-14) borehole 0.00 $0 <br />Revegetate MDW pads approved TR-123 (not previously approved PR-14) <br />INDIRECT COSTS <br />Colorado Division of Reclamation, Mining and Safety <br />Reclamation Cost Summary <br />Prepared by: TK Date: 12/14/2010 <br />Job action: TR-123 County: Gunnison <br />GRAND TOTAL DIRECT COSTS 132.35 $141,174 <br />Liability insurance: 2.02% % of direct costs total = $ 2,852 <br />Performance bond: 1.05% % of direct costs total = $ 1,482 <br />Job superintendent: 132.35 hrs. at $ 39.38 per hour total = $ 5,212 <br />Profit: 10.00% % of direct costs total = $ 14,117 <br /> TOTAL O & P= $ 23,663 <br /> CONTRAC T AMOUNT (direct + O & P)= $164,837 <br />Financial warranty processing (legal/related costs): NA <br />Engineering work and/or bid preparation: 4.25% % of contract $ 7,006 <br />Reclamation management and/or administration: 5.00% % of contract $ 8,242 <br /> NA % of direct costs <br />Total indirect reclamation costs $ 38,911 <br />Total performance bond amount (direct costs plus indirect costs) $180,085