Laserfiche WebLink
Stark, Jim <br />From: Stark, Jim <br />Sent: 16 December, 2010 09:54 <br />To: Boulay, Mike <br />Cc: Brown, Sandy <br />Subject: Oxbow MR-93 <br />Attachments: Oxbow MR-93 RCE.pdf <br />Mike, <br />Attached is the reclamation cost estimate for the revised Oxbow MR-93 - seven gob vent boreholes. The estimate is <br />two tasks (a summary sheet and task 281) and represents an increase in liability of $18,094.00. This estimate will <br />replace the estimate completed on 3 December 2010 in its entirety. All of the GVB's proposed in MR-93 will be drilled <br />on pads (and accessed by roads) that were previously permitted and bonded for with TR-63. Since OMLLC is currently <br />over-bonded by approximately $155,000.00, they will not need to submit any additional bond for MR-93. I have placed <br />a copy of this estimate in for scanning. Please let me know if you have any questions regarding this estimate. <br />James R. Stark <br />Environmental Protection Specialist <br />Colorado Department of Natural Resources <br />Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />303-866-3567 X8145 <br />www.mining.state.co.us